• Term: 54 months
  • Current Statues: Completed

مطار الملك عبد العزيز الدولي

King Abdulaziz International Airport Cold Water Distribution Production Project.
A sub-contract with the Saudi Al-Amoudi Group to operate and maintain a 50-kiloton cold water system with a 45-kilometre network of pipes, pulleys and related items, including 4 loading centers.

Arabic